Rolling Green Water and Stormwater

Rolling Green Water and Stormwater Improvements:

This project will include the replacement of potable water mains and services throughout the project area (as shown on the Capital Improvement Projects map).  This new piping system will improve water pressure, water quality, and fire protection throughout the area.

The project will also include renovation of the swales, which act to capture and treat stormwater, and localized improvements to eliminate street-flooding in certain areas.

Following is a listing of contact persons for the project:

  • Engineer/ Construction Manager - Aaron Cutler with Mathews Consulting, Inc. - (561) 762-1039
  • City's Representative - Paul Fleming with the Utilities Dept. - (561) 389-9912
  • Inspector for the City of Boynton Beach- Clifford Rockey,  - (cell phone no. 523-7794)
  • Inspector for Mathews Consulting- Alex Ballum, - (cell phone no. TBD)
  • Contractor's project manager - Alex Carstens with GlobeTec Construction - (954) 931-5226

Project Status:

The contractor is mobilizing his equipment, and we expect construction to begin on Monday July 6, 2009 .

 

 Updated 6/19/2009

 


 